It mainly manufactures kinds of Scrap Metal Baler, Shear, Scrap Metal Shredder, Waste Automobile Dismantling Equipment, Non-metal Baler, Compactor and the Complete Production Line of Household Garbage. The products are used in the National Circular Economy Park, National Urban Renewable Resource Base, Steel and Nonferrous Metal enterprise, Waste Steel Processing Center (Base) and Household Garbage Processing Center.

Micro-News | Huahong Technology's renewable resources equipment manufacturing and operation segment held the regular economic work meeting in the third quarter of 202

1.png

After the sudden epidemic, Huahong spent the second quarter with distinctive features, under the theme of "fighting the epidemic, grabbing the market, stabilizing the output and pursuing the target", the third regular economic work meeting of Huahong Group in the third quarter of 2022 was held in the conference room on the sixth floor of Engineering Technology Center. Sixth floor conference room was held.

01|Huahong Science and Technology subsidiaries report

2.jpeg

3.jpeg

4.jpeg

5.jpeg

Huahong environmental protection equipment, Donghai Huahong, Beijing Huahong, Qian'an Juili reported the second quarter operation and the third quarter work plan.

 02|Reporting by Zhu Dayong, Director and Deputy General Manager of Huahong Science and Technology

6.jpeg

Mr. Zhu Dayong, Director and Deputy General Manager of Huahong Technology, made a report on the operation and management of Huahong Technology segment and investment and control management in the second quarter.

03|Report by Hu Pin Long, General Manager of Hua Hong Technology

7.jpeg

Hu Pinlong, general manager of Huahong Technology, made a report on the work of the third quarter with the theme of "fighting the epidemic, grabbing the market, stabilizing the output and chasing the target", analyzing the completion of the second quarter production and sales of the parent company of Huahong Technology and the renewable resources equipment and operation segment, the operation and management of the second quarter, and emphasizing the operation target and work focus of the third quarter.

04|Hu Shifa, Vice President of Finance of the Group, put forward the specific requirements of financial strengthening management

8.jpeg 

05|Group General Manager Hu Pinxian made a work report

9.jpeg

Hu Pinxian, the general manager of the group, summarized the meeting and put forward quarterly work requirements. The theme of the report was "cherish the present moment, only efforts cannot be disappointed, be grateful for having, establish pragmatic to harvest, go all out to fight for time and finish to catch up". Finally, he proposed six preparations to be made in the third quarter.

10.png

11.png


12.png

 

13.png

06|Speech by Chairman Hu Shiyong

14.jpeg

Chairman Hu Shiyong put forward the general requirements for the work on the surface: the epidemic should be prevented, the economy should be stabilized, and the development should be safe; the requirements for each segment in the third quarter: clearer targets, catching up and exceeding; grasping completion, increasing orders; strong initiatives and powerful promotion.